Pre-shift check Failed

Crew B · Shingles · 5 people · Nov 24, 2026 6:20 AM · Mike Torres · 0.0 hours

Cleared Nov 24, 2026 8:10 AM by Chris Bell: Shop checked it: holding pressure under load. OK to run; seal kit on order.

Work order WO-0001: Waiting on parts.

ItemResult
Controls work smoothly, nothing sticking or worn OK
Hydraulic oil level OK, no leaks at hoses, fittings, or cylinders OK
Engine oil, coolant, and fuel OK; no warning lights OK
Tracks or tires: tension or pressure right, no damage OK
Undercarriage: rollers, idlers, and sprockets OK OK
Bucket, teeth, and cutting edge: tight, not worn through OK
Quick coupler locked and pin in place OK
Boom, stick, and blade: no cracks; pins and keepers in place; greased
Bucket drifts down about an inch in 10 min
Problem
Horn, lights, backup alarm, and travel alarm work OK
Seat belt, ROPS, mirrors, and cab glass OK OK
Brakes and swing lock work OK
811 marks still visible; trench box and sloping ready if the job needs them OK
Ground is firm; power lines and buried utilities checked OK
Fire extinguisher, guards, steps, and handrails in place OK
Crew lead's manual and crew papers in the cab OK

Notes

Yard check before loading out.